Pruitt-Igoe after hand-demolition

Completed in 1956 as public housing in St. Louis, Missouri, these Pruitt-Igoe buildings have undergone hand-demolition and removal of all ground floor building material, probably due to the higher salvage value of the tile bricks which lined the entrance hall and other ground floor rooms. (circa 197...

詳細記述

保存先:
書誌詳細
第一著者: Wendel, George D.
フォーマット: Online
出版事項: 1975
オンライン・アクセス:http://cdm17321.contentdm.oclc.org/cdm/ref/collection/photos/id/8025
タグ: タグ追加
タグなし, このレコードへの初めてのタグを付けませんか!
その他の書誌記述
要約:Completed in 1956 as public housing in St. Louis, Missouri, these Pruitt-Igoe buildings have undergone hand-demolition and removal of all ground floor building material, probably due to the higher salvage value of the tile bricks which lined the entrance hall and other ground floor rooms. (circa 1975) [Photographer G. Wendel. Scan of image PHO 54.8.17a]